Photo: South Gate overhang -- back in place
The Operating Engineers, with the assistance of RMA Maintenance, replaced the South Gate overhang Wednesday morning. The structure was hit by a too-tall truck last August. Repairs were delayed by problems with the supports, which weren't built according to blueprints, the RMA said. The RMA plans to stucco the pillars once the structure is inspected.
- Log in or register to post comments